Pool opening prices spring 2024

ABOVE GROUND POOLS

ALL OPENINGS INCLUDE
Remove winter plugs
Start up pump/filter
Add opening chemicals
Install existing ladders
WE DO NOT VACUUM WITH OPENING


PARTIAL OPENING

(Customer removes cover)

STARTING AT          $240.00

FULL OPENING
(We remove, clean, and fold cover)

STARTING AT          $300.00

FULL OPENING WITH WATER TUBES
(We remove, clean, and fold cover and water tubes)

STARTING AT          $360.00

​​​JAYZEES Pool and Spa Supplies


ATTENTION

FOR THE SAFETY OF OUR CUSTOMERS AND OUR SERVICE PERSONNEL, OUR COMPANY POLICY WILL BE --- OUR SERVICE TECHS WILL NOT BE PERMITTED TO GO INTO HOMES, BASEMENTS, SHEDS OR  ANY ENCLOSED LIVING AREAS.

​​​​Pool opening prices spring of 2024

​​​​IN GROUND POOLS

ALL OPENINGS INCLUDE

Remove winter plugs
Start up pump/filter
Add opening chemicals

Install existing ladders and handrails
WE DO NOT VACUUM WITH OPENING


PARTIAL OPENING

  • (Customer removes cover) 
  • STARTING AT          $280.00



FULL OPENING WITH SAFETY COVER

  • (We remove, clean, and fold cover) 
  • STARTING AT          $360.00



FULL OPENING WITH WATER TUBES

  • (We remove, clean and fold cover and water tubes)
  • STARTING AT          $400.00   ​



IF YOU CHOOSE JAYZEES TO OPEN YOUR POOL,  PLEASE READ THE FOLLOWING.

-​We will schedule your opening for a specific day.

-We cannot schedule a specific time of day.

-You do not have to be home as long as we have access   

  to the pool and equipment.


Customer responsibilities

-Please have all start up equipment (return eyeballs, skimmer baskets, etc.) from sheds, basements and

garages, out by the pool.


-Remove water from cover.

Minimum $125.00 per hour, charge if we pump off the cover. It should already be clear, if you used a cover pump all winter.


​-Ensure that the pool water is filled and the water level is in   the middle of the skimmer. If water level is too low, we will not be able to start the system. 

$110.00 charge for a return trip to start up your swimming pool.


 -Ensure that the electricity, and out

side water are turned on.


 -After your opening

Circulate the water for 48 hours before testing or balancing


Thank you for choosing Jayzees

for your swimming pool needs!